2024-01-18
1775
#figma
Reda Attarça
184898
Jan 18, 2024 ⋅ 6 min read

Using FigJam AI in a design workflow

Reda Attarça Reda is a French expatriate currently residing in Germany. Since 2019, he has worked as a UX designer in diverse sectors, including health, AI, and education software. Apart from his career, Reda enjoys reading and doodling between walks in the nearest woods.

Recent posts:

Designing AI rejections

How to design AI rejections users can understand and challenge

When AI says no, users need a clear reason, a chance to correct the record, and a way to reach a human reviewer.

Neil Nkoyock
Nov 17, 2026 ⋅ 11 min read
14 Cognitive Principles Every UX Designer Should Know

14 cognitive principles every UX designer should know in 2027

A 2027 guide to 14 cognitive principles for UX designers, with examples for AI-assisted work, mobile navigation, and tasks users need to resume.

Chinwe Uzegbu
Nov 12, 2026 ⋅ 10 min read
Using Retro 90s Website Design To Inspire Modern UX

Using retro designs from 90s websites to inspire modern UX

Nostalgia-driven aesthetics is a real thing. In this blog, I talk all about 90s website designs — from grunge-inspired typography to quirky GIFs and clashing colors — and what you can learn from them.

Neel Dozome
Nov 11, 2026 ⋅ 8 min read
How to fix AI prototype drift before design handoff

How to fix AI prototype drift before design handoff

AI-generated prototypes can drift from the product you intended to build. Learn how to detect missing requirements, anchor prompts to your design system, and combine AI generation with careful review and manual refinement.

Shalitha Suranga
Nov 10, 2026 ⋅ 13 min read
View all posts